I booked the services of my mate Mark Edwards who fortunately had a Draper Engine crane he bought when building a Westfield a few years ago.
I wasn't quite sure of the full weight of the engine/gearbox combination, however a fair bit of it is alloy - cylinder heads, inlet manifold, water pump etc so that reduced it a bit. I also removed the starter motor (for weight) and distributor (to avoid damage).

The crane we had was rated at 1000kg, dropping to 250kg at full extent. We actually managed to lift the engine at the 250kg setting which was just as well due to the reach required.
The gearbox end does drop a fair bit on lifting but was easy to manually level while we maneuvered the lump around.
So all done and bolted down at the front, ensuring that the gearlever was central to the chassis.
Drivers side bracket - all in line |
With the engine finally down on the front mounts we used a ratchet strap to hold the gearbox tail in position while we worked out how to fit the gearbox mounting bracket. This is a bit of a fiddle as you have to raise the car sufficiently to mark, drill and tap the chassis from below. I used 4 x M10 Setscrews to fix the bracket and I don't think its going anywhere!
Having the crane around was quite handy for raising the rear of the car while working on the gearbox bracket - with suitable axle stands deployed of course!
I took the opportunity to fit the starter motor and rotated the solenoid to be below the motor as recommended in a number of threads on the forum. This seems to solve problems with heat soak causing starting problems.
Now to crack on with the build!
No comments:
Post a Comment